
Ellora Contracting Co.
Industrial & construction contracting
Since 2004, Ellora Contracting Co. has delivered civil, mechanical, electrical, and manpower-supply work across Saudi Arabia's biggest industrial sites — from YANSAB to NEOM. Overden Route now runs their material and equipment stock, site deliveries, and crew attendance across every active project.
زيارة Elloraموقع ’s20 عامًا من العقود الصناعية، الآن نتابع المخزون والتسليمات عبر Overden Route
قبل Overden
- •Twenty years of material and equipment supply across sites in Yanbu, Jeddah, Rabigh, and NEOM meant tracking what was issued to which site, with no single stock record showing what the yard actually held.
- •Purchases for each site's material and equipment needs were raised separately, with no tie-back to what was actually received or deployed on site.
- •Manpower attendance across dispersed sites was tracked on paper or spreadsheets sent in at the end of each day, sometimes hundreds of kilometers from the Yanbu office.
- •Vehicles carrying material and equipment between sites had no live visibility once they left the yard.
مع Overden
- •Stock movements record every unit of material and equipment issued to or returned from a site, so the yard's real position is never a guess.
- •Purchases from suppliers post straight into the same stock ledger, so what's ordered, received, and deployed all trace back to one record.
- •Delivery IN/OUT logs each vehicle load leaving the yard and arriving at site, with live driver location tracking for the trip in between.
- •يتم تسجيل الحضور من الموقع نفسه، لذا يكون عدد الأفراد في كل مشروع محدثًا دون انتظار وصول ورقة ورقية إلى المكتب.
لماذا يعمل ذلك
- •Twenty years of deploying manpower, material, and equipment across dispersed industrial sites is exactly the stock-movement and delivery coordination problem Overden Route is built around.
- •Running purchases, deliveries, and attendance through one system means a site supervisor and the Yanbu office are always looking at the same numbers, not a version that's a day old.
كيف تم طرحه
2004
Founded in Yanbu
Ellora's first project was material supply for the Ibn Rushd Expansion Project in Yanbu, working with Technip Italy.
2005 – 2020
Two decades of industrial contracts
Manpower, civil, and mechanical work across YANSAB, Petro Rabigh, KAUST, the Yanbu Power & Water projects, and YASREF, growing to over 2,000 professionals and 500 projects delivered.
2021 – 2025
Expansion into NEOM and new sectors
CCTV, electrical, and civil works for national giga-projects alongside established refinery and power clients, plus new contracts with Saudi Carbonate Co. and P&G.
Now
Running on Overden Route
Material and equipment stock, purchases, site deliveries, driver tracking, and crew attendance across every active site now run from one Overden Route workspace.
Ellora Contracting Co. يعكس نوع بيئة التشغيل التي توفرها Overden الطريق مصمم لـ: احتياجات تنسيق عالية، تدفقات عمل متكررة، وحاجة واضحة لمصدر تشغيل موحد للحقائق.
استكشاف Route